The Specifications
Explained
LOADING CART
Each furnace is supplied with a cart or dolly which can be
rolled in and out of the furnace. This allows the operator
to load heavier parts using a hoist of forklift thereby
reducing operator handling.
CHIMNEY SECTIONS
Three 1 metre sections of double insulated stack are
supplied with the furnace. Additional sections may be
required depending on roof height. A roof plate, storm
collar and terminal are also provided.
CONTROL BOX
We offer two types; the STANDARD with a manual cycle timer
set by the operator or the RATE CONTROLLED automated system
which controls the exact time required to clean the parts -
no more, no less. The RATE CONTROLLED option is fitted as
standard on the GOLD model and can be fitted to the BRONZE
and SILVER options at additional cost.
MESH/STAINLESS STEEL LINER
The BRONZE and SILVER models have a mild steel expanded mesh
protection liner to minimise any damage which might be
caused by parts overhanging the cart space. The gold model
has a stainless steel liner fitted for superior protection.
TRIM SKINS
Fitted to the outside of the furnace on the SILVER and GOLD
models, trim skins create a cool wall effect for increased
health and safety in heat sensitive areas or areas of high
personnel traffic.
CHART RECORDER
Fitted to both the GOLD and SILVER models, this 2 pen
recorder will give a printed record of the furnace chamber
and stack temperatures for the duration of each cycle. This
record can help with fault diagnosis and is recommended by
Local Authorities.
WATER FILTER
Required if small size impurities are likely to be present
in the water supply. Reduces the likelihood of nozzles
becoming blocked.
LIME FIGHTER
Hard water areas require this option to prevent limescale
build up which unless prevented would eventually cause water
nozzles to become blocked. In hard water areas this is an
essential option.
WATER PRESSURE KIT
For the water system to work at its best a minimum pressure
of 2.7bar is required under flow conditions. As the water
pressure kit only requires one connection it can be
installed quickly. The kit includes an approved A-GAP tank,
a pump and a 5 litre pressure vessel with pressure switch to
ensure that the pump only operates when required.
MAINTENANCE TOOLBOX
The last thing a customer wants is to have to wait for
parts. This kit contains essential spares needed to keep
your furnace working. Spare water nozzles, fuses and
thermocouple elements are included together with the correct
size spanners for the nozzles, an adjustable wrench, a multi
meter and various other essential items.
COMMISSIONING
On completion of installation by the customer, one of our
engineers will visit the site and commission the unit.
Operator training will be performed at the same time. This
service is included on all furnace models and is free of
charge for U.K. mainland customers.
RIGHT OR LEFT HANDED
All furnace models can be made with the control panel and
other controls on the left or right side of the furnace.
This is especially relevant when positioning the furnace
near a side wall.
PLEASE NOTE: All of the above options can be
fitted at additional cost if not fitted as standard.
|