Pollution Control Products Co Burn-Off Ovens
v
Alternative Cleaning Methods
Pollution Control Products
Co PTR Burn-Off Oven V Chemical Paint Stripping Method
|
|
PTR Burn-Off Oven: £12,741.00 fully
installed and operating.
Operational cost p.a. based on 40 jigs per load (120 per week) |
|
Number of Jigs per cycle |
40 |
Cost Per Jig |
|
Process Time |
4 Hours |
|
|
Natural Gas\Electric (High
Tariff |
£5.03 |
0.12 pence |
|
Natural Gas\Electric (Low Tariff |
£2.39 |
0.05 pence |
|
LPG (Tanked) |
£10.21 |
0.25 pence |
|
Diesel Oil (Tanked) |
£3.13 |
0.07 pence |
|
Labour Per Cycle |
0.50 hours |
|
|
| Paint Stripping Method by
Chemicals |
|
Average purchasing cost of chemicals per year
(involves laborious handling of jigs during cleaning) |
£10,000.00 |
|
Disposal Costs |
£100.00 |
|
Total Cost per year |
£10,100.00 |
|
EFFECT/PAY-BACK ON FULL YEARS PROFIT
|
|
Overall Saving |
(£10,100 - £400.00) |
£9,700.00 |
|
Less Depreciation |
(£12,741.00 @ 10%) |
£1,274.00 |
|
Effect on Full Years Profit |
|
£8,826.00 |
| |
|
|
|
PAY BACK PERIOD |
£12,741.00
(£8,826.00 + £1,274.00) |
1.3 YEARS |
(Above figures kindly supplied by NT Legge)
|
Pollution Control Products
Co PTR 260 Burn-Off Oven V Fluidised Bed Method
Based on a Burn-Off Oven with a 4-hour cycle, and Fluidised Bed process
time of 1 hour. |
|
Operating Description |
Burn-Off Oven |
Fluidised Bed Method |
|
Nat. Gas/Electrical (High
Tariff)** |
£6.09 |
£5.50 |
|
Process Time |
4 hours |
1 hour |
|
Labour Time Per Load
(load/unload) |
¼ hour |
1 hour |
|
Labour Time Per Load (ash
removal) |
½ hour |
0 hour |
|
Labour Cost Per Load (£5.50
p/hr) |
£4.13 |
£5.50 |
|
Production items per day to be
cleaned |
4500 |
4500 |
|
Estimated Load Size |
1000 |
1000 |
|
Loads Per Day Estimated |
5 |
6 |
|
Daily Operating Costs |
£51.10 |
£66.00 |
|
Annual Operating Costs
(typically 250 days) |
£12,775.00 |
£16,500.00 |
|
Equipment Cost PTR260 Vs
Fluidised Bed** |
£19,300.00 |
£31,250.00** |
|
Annual Cost of Capital @ 10% per
year |
£1,930.00 |
£3,125.00 |
|
First Years Cost including
purchase |
£34,005.00 |
£50,875.00 |
|
Saving Compared to Fluidised Bed
Process |
£16,870.00 |
|
|
|
**Please note
that all figures stated on alternative process has been taken from
competitors own literature. The figures stated above may not be
accurate and therefore we can not be held responsible for changes or
accuracy in the calculation’s or comparisons to our own operating costs. |